{"id":2125,"date":"2017-04-04T14:13:23","date_gmt":"2017-04-04T12:13:23","guid":{"rendered":"https:\/\/www.transco-gmbh.de\/neubau\/"},"modified":"2022-01-18T14:56:09","modified_gmt":"2022-01-18T13:56:09","slug":"neubau","status":"publish","type":"post","link":"https:\/\/www.transco-gmbh.de\/en\/neubau\/","title":{"rendered":"Our new building"},"content":{"rendered":"\n<h1>\n\t\tOur new building\n\t<\/h1>\n<h3>\n\t\t&#8220;We have now reached the home stretch&#8221;\n\t<\/h3>\n\t<p>This is how the two managing directors, Mr. J. Brenner and Mr. G. K\u00f6pf, describe the current status of the construction project. After 2 \u00bd years of construction, only minor changes still need to be made inside the two newly built halls. This was preceded by a construction phase divided into several phases.<\/p>\n<p>Excavation work for the new administration building began in April 2015. By spring 2016, a modern building with a usable floor space of 800 m2 had been constructed, which extends over 4 floors. It houses offices for the administration, the development department with work preparation, meeting rooms, break rooms and social rooms.<\/p>\n\t<p>This is how the two managing directors, Mr. J. Brenner and Mr. G. K\u00f6pf, describe the current status of the construction project. After 2 \u00bd years of construction, only minor changes still need to be made inside the two newly built halls. This was preceded by a construction phase divided into several phases.<\/p>\n<p>Excavation work for the new administration building began in April 2015. By spring 2016, a modern building with a usable floor space of 800 m2 had been constructed, which extends over 4 floors. It houses offices for the administration, the development department with work preparation, meeting rooms, break rooms and social rooms.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Our new building &#8220;We have now reached the home stretch&#8221; This is how the two managing directors, Mr. J. Brenner and Mr. G. K\u00f6pf, describe the current status of the construction project. After 2 \u00bd years of construction, only minor changes still need to be made inside the two newly built halls. This was preceded&hellip;<\/p>\n","protected":false},"author":3,"featured_media":1767,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-2125","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/posts\/2125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/comments?post=2125"}],"version-history":[{"count":7,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/posts\/2125\/revisions"}],"predecessor-version":[{"id":2945,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/posts\/2125\/revisions\/2945"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/media\/1767"}],"wp:attachment":[{"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/media?parent=2125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/categories?post=2125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.transco-gmbh.de\/en\/wp-json\/wp\/v2\/tags?post=2125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}